Project Description
Charlton Court Road, Cheltenham
Project Details
EXTENSION
A first floor extension above the existing garage that ran from the front of the house to the back
TIMBER FRAMING
The timber frame formed the structure of the first floor renovation above the garage.
RENOVATION
Internal and external renovations including a complete rewiring, tiling, creation of a deck and new turf.
BLOCK PAVING
Clearing the existing driveway before laying a new block pave driveway.
Project Gallery
Project Phase 1: Preparation
New structural foundations were required to the rear of the extension in the form of piles and rings beams due to the mains drain running along the rear of the garden.
Project Phase 2: First Floor and Rear Extension
After stripping the existing garage roof, we inserted steelwork to support the new second storey cavity walls. New floors and roofs were constructed by our carpenters who did a create job on a complicated structure.
Project Phase 3: Internal Alterations
Inside the house we completed a full rewire and fitted a new heating system. New plastering, painting, wall & floor tiling, batrooms suites and floor coverings were also copleted during this phase of the renovation.
Project Phase 4: External Alterations
Outside, we built a new deck so you could step out onto a level platform with steps leading to the lawn area. Shaped walls were built to give the garden some character. To finish off a new blocked paved driveway was laid which continued to the side of the house and garden.